Early Production Facility – Yemen

Project information

Yaalen Early Production Facility Phase1, Yemen. Design and Engineering of 10,000 BOPD Early Production Facility including Complete Oil Treatment & Separation, Water Treatment, High-Pressure Re-injection, crude storage and all Associated Utilities.

Software

Autocad, Cadworx, Navisworks, Caesar II

Category

Upstream Oil and Gas

Location

Yemen

Client

McMurtrie Limited

Delivered

Design deliverables including:-

  • Engineer and design.
  • Interactive 3D model.
  • Steelwork design
  • Piping design
  • Complete set of 2D fabrication drawings.
  • General Arrangement and plot plan drawings.
  • Pipe support drawings.
  • Structural design and details.
  • Analysis of piping and structures.
  • Automatic generation of piping isometrics..
  • Material lists and other documentation.