Gas Control Skids – North Sea

Project information

Piping and Structural design of 2 fuel gas skids and 2 purge skids conforming to stringent client specifications and destined for the Culzean Field in the North Sea. These units were designed to control gas and diesel to heater burners on the platform.

Software

Autocad, Cadworx, Navisworks, Caesar II and Staad Pro

Category

Oil and Gas

Location

Culzean Field Development - Off Shore

Client

John Zink Hamworthy Combustion.

Delivered

Design deliverables including:-

  • Interactive 3D models.
  • Skid steelwork design
  • Piping design
  • Complete set of 2D fabrication drawings.
  • General Arrangement and plot plan drawings.
  • Pipe support drawings.
  • Structural design and details including bolting down details.
  • Analysis of piping and structures.
  • Automatic generation of piping isometrics.
  • Material lists and other documentation.
  • Client visits, Model and design reviews.